Showing posts with label reading in bed shrug. Show all posts
Showing posts with label reading in bed shrug. Show all posts

Wednesday, January 16, 2008

Time to Read?

The Reading-in-Bed Shrug was completed over the weekend but I really couldn't take a good picture until today. So here's the first peek at the first FO of the year.

Read


This shrug's made for my mum in mind, in time for her birthday. In MARCH. I know. Call me paranoid, but I think if you realize what kind of speed I have, the possibility of me finishing gifts in time ranges from 0% to 100%.

Read


The pattern was really easy to remember but I had a problem at the end. Because it tells me to 'BO loosely' (and it didn't say CO loosely), I did exactly as it said. And then I ended up with a nice snug sleeve and a loose, squarish one on the other side. Everyone also knows what it's like to rip mohair. But I had to do it; the difference was too great to be forgiveable.

Read

Reading-in-Bed Shawl from Interweave Knits Spring 2007 in Sublime's Mohair blend with 5.5mm Addi Turbos.

Anyways I've used much less yarn than expected so now i've got quite a bit left. I thought I'd make myself another shrug but today I was inspired by MLC's wisp... so... hint hint.

More on wips and spinning progress tomorrow.

Yin & Yang

Friday, January 04, 2008

And now in Progress...

I've started two projects over the Christmas and New Year holidays. The first is a lace project started because I thought the Kimono was so beautiful and I wanted to make another lace shawl NOW. I looked around and while there were a number of beautiful shawls I love out there, I just couldn't find the right color from my stash. In the process, I also added a load of new projects onto my Ravelry queue. At this rate I'll take about 10 years to finish everything on that queue.

So when I saw the Lily of the Valley Shawl from Lace Style, I casted on almost immediately. (At the Starbucks where we were having coffee actually)

Muguet de Mai

(oh the blue thing there is a folder AS bought for me. Now I put my project patterns in there. :D it's a great size and I love it!)

And then I started another project because Mum says my Coquette is nice. Well. If you know my mum, she's not usually the kind who's interested in crafting and all. She doesn't stop me from doing it, but she was just never really interested in the process, the effort or the finished product. But she actually was impressed with the Coquette (and subsequently Kimono) and I thought I'd make her the Reading-in-Bed Shrug.

shrug in progress

I'm posting this actually because she doesn't use the Internet and no one in my family visits this blog. If my brother does, then he'll be quiet about it I'm sure. I chose a smaller project (than a shawl) for now because I have only 3 months to her birthday. The shawl will have to come later.

Speaking of gifts, MLC's scarf project has got me wondering if I should make some his&her scarves for us on Vday but that means I have 1 month to finish things. And then if I were to make two that would mean 2 weeks per scarf. Sounds possible but remember, you're talking about me here.

It also made me regret not planning my knitting time better because... I thought I should have made something for a friend on our birthday. That would leave me... about 20 hours to finish the project?

In the occasion of frenzy, turn to other capabilities.

And I beaded her earrings. I made two of the same pair (I want one myself) and I'll blog about them when I've gifted them so stay tuned~

PS: It's MangMang's birthday today so go ahead and wish her a happy birthday here or here.